20 November 2026 · Oslo

Oslo T-bane closes 63 of 101 stations from 19 to 22 November

Sixty-three of Oslo's 101 metro stations are closed around the clock from Thursday 19 November until the first departure on Monday 23 November for signalling tests. Lines 4 and 5 are closed, and Lines 1, 2 and 3 operate only on western sections.

Transport & weather DeskAI-ASSISTED REPORTING (Magnus)
20 November 2026 · 2 min read
Coverage
Oslo

Oslo’s metro, T-bane, is closed at 63 of its 101 stations from Thursday 19 November to Sunday 22 November 2026 inclusive. The closure runs around the clock, with normal services resuming from the first departure on Monday 23 November; Ruter does not state a specific clock time for the first departure. No metro trains run through the city centre, leaving central stations including Nationaltheatret, Stortinget, Jernbanetorget, Grønland and Tøyen without service, along with the entire network east of Frøen. Lines 4 and 5 are closed completely, while Lines 1, 2 and 3 run only between stops in western Oslo.

Infrastructure operator Sporveien is testing the new digital signalling system, CBTC (Communication-Based Train Control), across the city centre, Ringen and the Sognsvann line during what Ruter calls the first major closure of the 2026–2027 metro upgrades. Both operators state that testing cannot take place with passengers on board and requires four consecutive days without service for safety reasons. Ruter notes that upgrades to the metro network will run through 2026 and 2027, with further closures planned. Ruter and Sporveien urge travellers to avoid unnecessary journeys and to walk or cycle where possible, because buses and trams cannot replace the metro’s capacity.

Alternatives

  • Line 1: runs only between Frognerseteren and Frøen.
  • Line 2: runs only between Østerås and Makrellbekken.
  • Line 3: runs only between Kolsås and Ullernåsen.
  • Lines 4 and 5: closed completely.
  • Replacement buses (Buss for T-bane): Bus 2B runs between Hovseter and Majorstuen; Bus 3B runs between Åsjordet and Majorstuen.
  • Trams (trikk): Lines 12, 13, 15, 17, 18, 19 and extra tram 19x operate in the city centre and near hubs such as Majorstuen.
  • Buses: Ruter runs reinforced and adjusted services on bus lines including 20 and 21, alongside lines 25, 30, 31, 34, 37, 45, 46, 54, 60, 70, 71, 74, 81, 100, 110 and 300, plus extra peak-hour departures on routes such as bus 76.

Check live timetables and route alternatives in the Ruter app or on Ruter’s planned changes page and metro travel advice page.

Fact-checked sources

✓ 4 sources verified

Produced by our AI-assisted transport & weather desk and checked claim-by-claim against these public sources before publication.

  1. Ruter, metro travel advice (English)ruter.no ↗
  2. Ruter, metro travel advice (Norwegian)ruter.no ↗
  3. Ruter, planned changesruter.no ↗
  4. Sporveien, CBTC testing closure noticesporveien.no ↗

Found a mistake? See corrections.

More from Oslo

Browse archive →
20 Nov · NewsNationwide

2027 state budget talks reach deadline ahead of Stortinget committee report

Negotiations between Norway's Labour minority government and four parliamentary partners on the 2027 state budget reached their internal 20 November deadline with disagreements still unresolved. Under Stortinget's official timetable, the Finance Committee must submit its budget framework report by 30 November, proposing spending caps that become binding if adopted in parliament's 7 December plenary vote.

News Desk · ✓ 9 sources

20 Nov · NewsNationwide

Supreme Court invalidates three North Sea oil approvals over global emissions

Norway's Supreme Court Grand Chamber has declared state approvals for the Breidablikk, Tyrving and Yggdrasil petroleum projects invalid because global combustion emissions were not properly assessed. Existing licences remain in force while the Ministry of Energy reprocesses the cases.

News Desk · ✓ 5 sources

Choose your edition